{"id":5507,"date":"2020-12-21T10:44:24","date_gmt":"2020-12-21T10:44:24","guid":{"rendered":"https:\/\/www.rae.gr\/network-development\/"},"modified":"2023-08-09T12:24:30","modified_gmt":"2023-08-09T09:24:30","slug":"development","status":"publish","type":"page","link":"https:\/\/www.rae.gr\/en\/electricity\/infrastructure\/distribution-network\/development\/","title":{"rendered":"Network Development"},"content":{"rendered":"\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t\t
\n\t\t\t
\n\t\t\t\t\t\t
\n\t\t\t\t
\n\t\t\t\t\t\t\t

Network development refers to investments to expand, strengthen, renovate and modernize the networks, as well as infrastructure, systems and equipment of the Network Operator and the Non-Interconnected Islands (NII) Electric System Operator, which mainly aim to:<\/p>

– serve electricity demand, including dealing with changes in load or generation characteristics
– meet the needs of connecting new users or modifying existing user connections
– improve the reliability of the Network and the quality of services
– meet safety requirements of Network operation and protection of the environment
– reduce the total long-term cost of the Network
– Operator\u2019s response to its duties in the most economical way
The development of the Network is planned on an annual basis. A key tool is the Network Development Plan, which is drawn up by the Network Operator and approved by RAE, and identifies the main axes of development of the Network with a five-year time horizon. The implementation of Network development is monitored through Development Programs drawn up on an annual basis by the Operator, based on the current Network Development Plan.<\/p>

More information regarding the criteria and related procedures are included in the Network Operation Code. Information on planning and development of the Network can be found here: (note 8)<\/p>

Network Development Plan<\/strong><\/p>